Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
3.3%
OF COST SPENT
₹1.63 L spent
of ₹49.65 L sanctioned
₹48.02 L still to spend
on 40 ongoing works
Works ongoing
40
Open the list of these works →
Sanctioned
₹49.65 L
Pure scheme (wage + material)
Expenditure since inception
₹1.63 L
3.3% of sanction
Balance cost (unspent)
₹48.02 L
Wage₹30.27 L
Material₹17.75 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh