Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
11.1%
OF COST SPENT
₹1.11 L spent
of ₹9.97 L sanctioned
₹8.86 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹9.97 L
Pure scheme (wage + material)
Expenditure since inception
₹1.11 L
11.1% of sanction
Balance cost (unspent)
₹8.86 L
Wage₹4.12 L
Material₹4.75 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh