Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
17.5%
OF COST SPENT
₹80,440 spent
of ₹4.60 L sanctioned
₹3.80 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹4.60 L
Pure scheme (wage + material)
Expenditure since inception
₹80,440
17.5% of sanction
Balance cost (unspent)
₹3.80 L
Wage₹2.27 L
Material₹1.53 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh