Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.9%
OF COST SPENT
₹94,808 spent
of ₹1.08 Cr sanctioned
₹1.07 Cr still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹1.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹94,808
0.9% of sanction
Balance cost (unspent)
₹1.07 Cr
Wage₹18.57 L
Material₹88.46 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost