Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.7%
OF COST SPENT
₹15.34 L spent
of ₹23.41 Cr sanctioned
₹23.25 Cr still to spend
on 586 ongoing works
Works ongoing
586
Open the list of these works →
Sanctioned
₹23.41 Cr
Pure scheme (wage + material)
Expenditure since inception
₹15.34 L
0.7% of sanction
Balance cost (unspent)
₹23.25 Cr
Wage₹9.96 Cr
Material₹13.30 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore