Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
59.5%
OF COST SPENT
₹12.00 L spent
of ₹20.18 L sanctioned
₹8.18 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹20.18 L
Pure scheme (wage + material)
Expenditure since inception
₹12.00 L
59.5% of sanction
Balance cost (unspent)
₹8.18 L
Wage₹52,088
Material₹7.66 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh