Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
15.3%
OF COST SPENT
₹7.02 L spent
of ₹45.77 L sanctioned
₹38.75 L still to spend
on 10 ongoing works
Works ongoing
10
Open the list of these works →
Sanctioned
₹45.77 L
Pure scheme (wage + material)
Expenditure since inception
₹7.02 L
15.3% of sanction
Balance cost (unspent)
₹38.75 L
Wage₹29.25 L
Material₹9.50 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh