Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
34.8%
OF COST SPENT
₹9.07 Cr spent
of ₹26.04 Cr sanctioned
₹16.97 Cr still to spend
on 120 ongoing works
Works ongoing
120
Open the list of these works →
Sanctioned
₹26.04 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.07 Cr
34.8% of sanction
Balance cost (unspent)
₹16.97 Cr
Wage₹8.76 Cr
Material₹8.21 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore