Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
52.3%
OF COST SPENT
₹1.06 Cr spent
of ₹2.02 Cr sanctioned
₹96.56 L still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹2.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.06 Cr
52.3% of sanction
Balance cost (unspent)
₹96.56 L
Wage₹37.00 L
Material₹59.57 L