Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
20.4%
OF COST SPENT
₹39.13 L spent
of ₹1.92 Cr sanctioned
₹1.53 Cr still to spend
on 48 ongoing works
Works ongoing
48
Open the list of these works →
Sanctioned
₹1.92 Cr
Pure scheme (wage + material)
Expenditure since inception
₹39.13 L
20.4% of sanction
Balance cost (unspent)
₹1.53 Cr
Wage₹1.21 Cr
Material₹31.27 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh