Data as of 16 Oct 2026, 08:36 Admin login
FY
Reset

Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
16.7%
OF COST SPENT
₹1.37 L spent
of ₹8.21 L sanctioned
₹6.84 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹8.21 L
Pure scheme (wage + material)
Expenditure since inception
₹1.37 L
16.7% of sanction
Balance cost (unspent)
₹6.84 L
Wage₹4.24 L
Material₹2.61 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

No works match these filters.