Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1.9%
OF COST SPENT
₹11.33 Cr spent
of ₹603.12 Cr sanctioned
₹591.79 Cr still to spend
on 6,971 ongoing works
Works ongoing
6,971
Open the list of these works →
Sanctioned
₹603.12 Cr
Pure scheme (wage + material)
Expenditure since inception
₹11.33 Cr
1.9% of sanction
Balance cost (unspent)
₹591.79 Cr
Wage₹232.82 Cr
Material₹358.97 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore