Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
0.4%
OF COST SPENT
₹1.65 L spent
of ₹4.36 Cr sanctioned
₹4.34 Cr still to spend
on 150 ongoing works
Works ongoing
150
Open the list of these works →
Sanctioned
₹4.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.65 L
0.4% of sanction
Balance cost (unspent)
₹4.34 Cr
Wage₹1.54 Cr
Material₹2.81 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore