Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
71.1%
OF COST SPENT
₹2.48 Cr spent
of ₹3.49 Cr sanctioned
₹1.01 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹3.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.48 Cr
71.1% of sanction
Balance cost (unspent)
₹1.01 Cr
Wage₹39.37 L
Material₹61.32 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore