Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
1.8%
OF COST SPENT
₹24.08 L spent
of ₹13.54 Cr sanctioned
₹13.30 Cr still to spend
on 703 ongoing works
Works ongoing
703
Open the list of these works →
Sanctioned
₹13.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹24.08 L
1.8% of sanction
Balance cost (unspent)
₹13.30 Cr
Wage₹6.37 Cr
Material₹6.93 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore