Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
12.8%
OF COST SPENT
₹8.84 L spent
of ₹69.18 L sanctioned
₹60.35 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹69.18 L
Pure scheme (wage + material)
Expenditure since inception
₹8.84 L
12.8% of sanction
Balance cost (unspent)
₹60.35 L
Wage₹48.14 L
Material₹12.20 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh