Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
78.8%
OF COST SPENT
₹3.43 L spent
of ₹4.35 L sanctioned
₹92,070 still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹4.35 L
Pure scheme (wage + material)
Expenditure since inception
₹3.43 L
78.8% of sanction
Balance cost (unspent)
₹92,070
Wage₹1,672
Material₹90,398
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh