Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
0.7%
OF COST SPENT
₹52,500 spent
of ₹80.50 L sanctioned
₹79.98 L still to spend
on 17 ongoing works
Works ongoing
17
Open the list of these works →
Sanctioned
₹80.50 L
Pure scheme (wage + material)
Expenditure since inception
₹52,500
0.7% of sanction
Balance cost (unspent)
₹79.98 L
Wage₹54.09 L
Material₹25.89 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh