Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2%
OF COST SPENT
₹7.89 L spent
of ₹3.98 Cr sanctioned
₹3.90 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹3.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.89 L
2% of sanction
Balance cost (unspent)
₹3.90 Cr
Wage₹1.58 Cr
Material₹2.32 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore