Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
0.2%
OF COST SPENT
₹405 spent
of ₹1.98 L sanctioned
₹1.98 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹1.98 L
Pure scheme (wage + material)
Expenditure since inception
₹405
0.2% of sanction
Balance cost (unspent)
₹1.98 L
Wage₹1.22 L
Material₹75,486
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh