Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
4.1%
OF COST SPENT
₹7.54 L spent
of ₹1.83 Cr sanctioned
₹1.76 Cr still to spend
on 21 ongoing works
Works ongoing
21
Open the list of these works →
Sanctioned
₹1.83 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.54 L
4.1% of sanction
Balance cost (unspent)
₹1.76 Cr
Wage₹42.62 L
Material₹1.33 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh