Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
3%
OF COST SPENT
₹3.01 L spent
of ₹1.01 Cr sanctioned
₹98.33 L still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹1.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.01 L
3% of sanction
Balance cost (unspent)
₹98.33 L
Wage₹64.98 L
Material₹33.35 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type