Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
14.3%
OF COST SPENT
₹12.72 L spent
of ₹88.97 L sanctioned
₹76.25 L still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹88.97 L
Pure scheme (wage + material)
Expenditure since inception
₹12.72 L
14.3% of sanction
Balance cost (unspent)
₹76.25 L
Wage₹51.71 L
Material₹24.54 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh