Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
1.2%
OF COST SPENT
₹1.02 L spent
of ₹85.62 L sanctioned
₹84.61 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹85.62 L
Pure scheme (wage + material)
Expenditure since inception
₹1.02 L
1.2% of sanction
Balance cost (unspent)
₹84.61 L
Wage₹51.23 L
Material₹33.37 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh