Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Crematorium
69.8%
OF COST SPENT
₹26.90 L spent
of ₹38.52 L sanctioned
₹11.62 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹38.52 L
Pure scheme (wage + material)
Expenditure since inception
₹26.90 L
69.8% of sanction
Balance cost (unspent)
₹11.62 L
Wage₹1.12 L
Material₹10.49 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh