Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
13.8%
OF COST SPENT
₹1.11 L spent
of ₹8.07 L sanctioned
₹6.96 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹8.07 L
Pure scheme (wage + material)
Expenditure since inception
₹1.11 L
13.8% of sanction
Balance cost (unspent)
₹6.96 L
Wage₹3.85 L
Material₹3.11 L