Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGRepair & maint of Percolation Tank
26.2%
OF COST SPENT
₹58.52 L spent
of ₹2.23 Cr sanctioned
₹1.65 Cr still to spend
on 28 ongoing works
Works ongoing
28
Open the list of these works →
Sanctioned
₹2.23 Cr
Pure scheme (wage + material)
Expenditure since inception
₹58.52 L
26.2% of sanction
Balance cost (unspent)
₹1.65 Cr
Wage₹1.01 Cr
Material₹63.46 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh