Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
46.8%
OF COST SPENT
₹3.50 Cr spent
of ₹7.48 Cr sanctioned
₹3.97 Cr still to spend
on 60 ongoing works
Works ongoing
60
Open the list of these works →
Sanctioned
₹7.48 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.50 Cr
46.8% of sanction
Balance cost (unspent)
₹3.97 Cr
Wage₹2.18 Cr
Material₹1.79 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown