Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
62%
OF COST SPENT
₹3.88 Cr spent
of ₹6.26 Cr sanctioned
₹2.38 Cr still to spend
on 55 ongoing works
Works ongoing
55
Open the list of these works →
Sanctioned
₹6.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.88 Cr
62% of sanction
Balance cost (unspent)
₹2.38 Cr
Wage₹1.72 Cr
Material₹65.93 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore