Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
18.2%
OF COST SPENT
₹29.25 L spent
of ₹1.60 Cr sanctioned
₹1.31 Cr still to spend
on 50 ongoing works
Works ongoing
50
Open the list of these works →
Sanctioned
₹1.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹29.25 L
18.2% of sanction
Balance cost (unspent)
₹1.31 Cr
Wage₹99.92 L
Material₹31.30 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh