Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
0.3%
OF COST SPENT
₹5,248 spent
of ₹20.00 L sanctioned
₹19.94 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹20.00 L
Pure scheme (wage + material)
Expenditure since inception
₹5,248
0.3% of sanction
Balance cost (unspent)
₹19.94 L
Wage₹14.61 L
Material₹5.34 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh