Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
27.1%
OF COST SPENT
₹75.70 L spent
of ₹2.80 Cr sanctioned
₹2.04 Cr still to spend
on 52 ongoing works
Works ongoing
52
Open the list of these works →
Sanctioned
₹2.80 Cr
Pure scheme (wage + material)
Expenditure since inception
₹75.70 L
27.1% of sanction
Balance cost (unspent)
₹2.04 Cr
Wage₹1.46 Cr
Material₹57.56 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore