Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1.9%
OF COST SPENT
₹24.35 L spent
of ₹12.53 Cr sanctioned
₹12.29 Cr still to spend
on 141 ongoing works
Works ongoing
141
Open the list of these works →
Sanctioned
₹12.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹24.35 L
1.9% of sanction
Balance cost (unspent)
₹12.29 Cr
Wage₹5.03 Cr
Material₹7.25 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L