Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0%
OF COST SPENT
₹5,100 spent
of ₹6.78 Cr sanctioned
₹6.78 Cr still to spend
on 46 ongoing works
Works ongoing
46
Open the list of these works →
Sanctioned
₹6.78 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5,100
0% of sanction
Balance cost (unspent)
₹6.78 Cr
Wage₹3.73 Cr
Material₹3.05 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore