Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
30.5%
OF COST SPENT
₹3.60 Cr spent
of ₹11.79 Cr sanctioned
₹8.19 Cr still to spend
on 189 ongoing works
Works ongoing
189
Open the list of these works →
Sanctioned
₹11.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.60 Cr
30.5% of sanction
Balance cost (unspent)
₹8.19 Cr
Wage₹4.05 Cr
Material₹4.14 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore