Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
3.4%
OF COST SPENT
₹13.40 L spent
of ₹3.96 Cr sanctioned
₹3.83 Cr still to spend
on 432 ongoing works
Works ongoing
432
Open the list of these works →
Sanctioned
₹3.96 Cr
Pure scheme (wage + material)
Expenditure since inception
₹13.40 L
3.4% of sanction
Balance cost (unspent)
₹3.83 Cr
Wage₹3.57 Cr
Material₹25.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore