Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
22.3%
OF COST SPENT
₹6.88 L spent
of ₹30.85 L sanctioned
₹23.97 L still to spend
on 10 ongoing works
Works ongoing
10
Open the list of these works →
Sanctioned
₹30.85 L
Pure scheme (wage + material)
Expenditure since inception
₹6.88 L
22.3% of sanction
Balance cost (unspent)
₹23.97 L
Wage₹13.64 L
Material₹10.33 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh