Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
44%
OF COST SPENT
₹56.02 L spent
of ₹1.27 Cr sanctioned
₹71.36 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹1.27 Cr
Pure scheme (wage + material)
Expenditure since inception
₹56.02 L
44% of sanction
Balance cost (unspent)
₹71.36 L
Wage₹21.14 L
Material₹50.21 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh