Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
45.3%
OF COST SPENT
₹6.42 L spent
of ₹14.17 L sanctioned
₹7.75 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹14.17 L
Pure scheme (wage + material)
Expenditure since inception
₹6.42 L
45.3% of sanction
Balance cost (unspent)
₹7.75 L
Wage₹3.45 L
Material₹4.30 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh