Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
66.2%
OF COST SPENT
₹96.78 L spent
of ₹1.46 Cr sanctioned
₹49.39 L still to spend
on 227 ongoing works
Works ongoing
227
Open the list of these works →
Sanctioned
₹1.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹96.78 L
66.2% of sanction
Balance cost (unspent)
₹49.39 L
Wage₹41.35 L
Material₹8.04 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh