Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGCattle Shed
50.5%
OF COST SPENT
₹2.86 Cr spent
of ₹5.66 Cr sanctioned
₹2.80 Cr still to spend
on 242 ongoing works
Works ongoing
242
Open the list of these works →
Sanctioned
₹5.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.86 Cr
50.5% of sanction
Balance cost (unspent)
₹2.80 Cr
Wage₹21.42 L
Material₹2.59 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown