Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
49.4%
OF COST SPENT
₹24.09 Cr spent
of ₹48.80 Cr sanctioned
₹24.71 Cr still to spend
on 351 ongoing works
Works ongoing
351
Open the list of these works →
Sanctioned
₹48.80 Cr
Pure scheme (wage + material)
Expenditure since inception
₹24.09 Cr
49.4% of sanction
Balance cost (unspent)
₹24.71 Cr
Wage₹15.83 Cr
Material₹8.89 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore