Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Bund
35.1%
OF COST SPENT
₹71.12 L spent
of ₹2.03 Cr sanctioned
₹1.32 Cr still to spend
on 45 ongoing works
Works ongoing
45
Open the list of these works →
Sanctioned
₹2.03 Cr
Pure scheme (wage + material)
Expenditure since inception
₹71.12 L
35.1% of sanction
Balance cost (unspent)
₹1.32 Cr
Wage₹68.52 L
Material₹63.07 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block