Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
55.6%
OF COST SPENT
₹16.40 Cr spent
of ₹29.51 Cr sanctioned
₹13.11 Cr still to spend
on 210 ongoing works
Works ongoing
210
Open the list of these works →
Sanctioned
₹29.51 Cr
Pure scheme (wage + material)
Expenditure since inception
₹16.40 Cr
55.6% of sanction
Balance cost (unspent)
₹13.11 Cr
Wage₹8.09 Cr
Material₹5.02 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore