Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
53%
OF COST SPENT
₹2.66 L spent
of ₹5.03 L sanctioned
₹2.36 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹5.03 L
Pure scheme (wage + material)
Expenditure since inception
₹2.66 L
53% of sanction
Balance cost (unspent)
₹2.36 L
Wage₹1.29 L
Material₹1.07 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh