Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
1.2%
OF COST SPENT
₹40,800 spent
of ₹34.97 L sanctioned
₹34.56 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹34.97 L
Pure scheme (wage + material)
Expenditure since inception
₹40,800
1.2% of sanction
Balance cost (unspent)
₹34.56 L
Wage₹15.91 L
Material₹18.65 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh