Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
35.1%
OF COST SPENT
₹79.96 Cr spent
of ₹227.69 Cr sanctioned
₹147.72 Cr still to spend
on 7,653 ongoing works
Works ongoing
7,653
Open the list of these works →
Sanctioned
₹227.69 Cr
Pure scheme (wage + material)
Expenditure since inception
₹79.96 Cr
35.1% of sanction
Balance cost (unspent)
₹147.72 Cr
Wage₹72.92 Cr
Material₹74.80 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — ATER ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore