Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1%
OF COST SPENT
₹10.10 L spent
of ₹10.02 Cr sanctioned
₹9.92 Cr still to spend
on 279 ongoing works
Works ongoing
279
Open the list of these works →
Sanctioned
₹10.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.10 L
1% of sanction
Balance cost (unspent)
₹9.92 Cr
Wage₹5.18 Cr
Material₹4.74 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore