Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
21.6%
OF COST SPENT
₹3.98 L spent
of ₹18.47 L sanctioned
₹14.49 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹18.47 L
Pure scheme (wage + material)
Expenditure since inception
₹3.98 L
21.6% of sanction
Balance cost (unspent)
₹14.49 L
Wage₹10.48 L
Material₹4.01 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh