Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
0%
OF COST SPENT
₹8,100 spent
of ₹1.70 Cr sanctioned
₹1.70 Cr still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹1.70 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8,100
0% of sanction
Balance cost (unspent)
₹1.70 Cr
Wage₹1.05 Cr
Material₹65.14 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore